Text: | Print| Download

    Beijing water plant ready for water diversion project(7/7)

    2014-10-30 09:02 Xinhua Web Editor:Li Yan
    1
    Workers decorate outer walls at Guogongzhuang Water Plant in Beijing, capital of China, Oct 24, 2014. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. (Xinhua/Yin Gang)
    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 塔城市| 洛宁县| 岢岚县| 周宁县| 兰考县| 宁武县| 古丈县| 泽普县| 廊坊市| 吴桥县| 萍乡市| 沅江市| 简阳市| 双柏县| 宁强县| 金塔县| 营山县| 郯城县| 雷波县| 乐陵市| 含山县| 临潭县| 上饶市| 磐石市| 峨眉山市| 临武县| 塘沽区| 德阳市| 鄂伦春自治旗| 邹平县| 沐川县| 闻喜县| 夹江县| 山西省| 南澳县| 浦县| 梁平县| 新绛县| 瑞安市| 敦化市| 琼海市|