Text: | Print| Download

    Beijing water plant ready for water diversion project(1/7)

    2014-10-30 09:02 Xinhua Web Editor:Li Yan
    1
    Zhang Zhouqiang, director of engineering department of the construction office of Guogongzhuang Water Plant, introduces water quality monitoring system at Guogongzhuang Water Plant in Beijing, capital of China, Oct 24, 2014. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. (Xinhua/Yin Gang)
    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 监利县| 广昌县| 慈利县| 谷城县| 电白县| 屏东市| 霍邱县| 山阳县| 绥芬河市| 施甸县| 庄河市| 阿克陶县| 金坛市| 根河市| 吴堡县| 沙田区| 开远市| 曲水县| 平顶山市| 长沙市| 五常市| 定州市| 杂多县| 沾化县| 永城市| 临泉县| 丁青县| 三门县| 南溪县| 灵丘县| 疏附县| 古浪县| 吕梁市| 蕉岭县| 积石山| 肇源县| 余姚市| 阜南县| 集安市| 瓦房店市| 建昌县|