Text: | Print| Download

    Beijing water plant ready for water diversion project(5/7)

    2014-10-30 09:02 Xinhua Web Editor:Li Yan
    1
    A worker walks past screen ponds at Guogongzhuang Water Plant in Beijing, capital of China, Oct 24, 2014. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. (Xinhua/Yin Gang)
    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 广昌县| 济南市| 宝丰县| 渭南市| 义乌市| 阿鲁科尔沁旗| 瑞昌市| 玛纳斯县| 溆浦县| 仁怀市| 新疆| 凯里市| 谢通门县| 山阴县| 民县| 潍坊市| 曲阜市| 云安县| 佛坪县| 滦平县| 柳林县| 东乡族自治县| 康乐县| 拉萨市| 潢川县| 博客| 西昌市| 天长市| 本溪| 施秉县| 安阳县| 克拉玛依市| 托克逊县| 沾化县| 赤水市| 双江| 浦东新区| 安仁县| 忻城县| 古蔺县| 玉门市|