Text: | Print| Download

    Beijing water plant ready for water diversion project(4/7)

    2014-10-30 09:02 Xinhua Web Editor:Li Yan
    1
    Photo taken on Oct 24, 2014 shows the screen room which is used to screen impurities with diameter over 1 centimeter in water at Guogongzhuang Water Plant in Beijing, capital of China. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. (Xinhua/Yin Gang)
    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 江川县| 邢台市| 巫山县| 南通市| 长海县| 株洲市| 威宁| 华安县| 赤壁市| 蒲江县| 洛扎县| 雅江县| 沙坪坝区| 达孜县| 乡城县| 灵宝市| 偃师市| 陆河县| 繁昌县| 石林| 手游| 剑河县| 泰州市| 杂多县| 珠海市| 武强县| 卢氏县| 大石桥市| 汉寿县| 石泉县| 太谷县| 玉山县| 阳江市| 双柏县| 石柱| 卓尼县| 玉树县| 塔城市| 曲麻莱县| 泾川县| 广南县|