Text: | Print| Download

    Beijing water plant ready for water diversion project(6/7)

    2014-10-30 09:02 Xinhua Web Editor:Li Yan
    1
    A worker tries to install the logo of Beijing Waterworks Group at Guogongzhuang Water Plant in Beijing, capital of China, Oct 24, 2014. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. (Xinhua/Yin Gang)
    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 峨眉山市| 望都县| 汽车| 深水埗区| 大荔县| 淮北市| 石门县| 彝良县| 湖口县| 东平县| 长沙县| 卢氏县| 延长县| 英山县| 天水市| 天长市| 微博| 林周县| 县级市| 新田县| 漠河县| 阿勒泰市| 深圳市| 东丽区| 双峰县| 高邑县| 娄底市| 阳原县| 驻马店市| 临漳县| 社旗县| 昌宁县| 买车| 衡阳县| 日喀则市| 阜平县| 额尔古纳市| 乐业县| 灵台县| 甘肃省| 玉树县|