Text: | Print| Download

    Construction of Hangzhou-Changsha high-speed railway underway (4/5)

    2014-01-29 16:06 Xinhua Web Editor:Li Yan
    1

    Workers lay tracks at a construction site of the Hangzhou-Changsha high-speed railway in Jiangshan City, east China's Zhejiang province, Jan 27, 2014. The 933-kilometer high-speed railway linking Hangzhou City and Changsha City, respectively capitals of Zhejiang province and capital of Hunan province, is designed at a top speed of 350km/h. The 295.5-kilometer rail-laying work in the Zhejiang section was completed on Wednesday after three months' hard work. Travel time will be reduced from more than six hours to four hours when the railway is put into operation, which is expected at the end of 2014. (Xinhua/Tan Jin)

    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 洱源县| 盐边县| 宜川县| 安新县| 申扎县| 安远县| 盐山县| 宿迁市| 临武县| 周至县| 牟定县| 曲周县| 修武县| 五大连池市| 永安市| 菏泽市| 昆山市| 游戏| 宣恩县| 平江县| 金昌市| 新化县| 安丘市| 南开区| 汝州市| 麻阳| 枝江市| 镇宁| 桦南县| 韶关市| 渭南市| 湘西| 宜丰县| 丁青县| 彩票| 嘉义县| 佛教| 沙河市| 丰宁| 大厂| 仁寿县|