Text: | Print| Download

    Construction of Hangzhou-Changsha high-speed railway underway (3/5)

    2014-01-29 16:04 Xinhua Web Editor:Li Yan
    1

    Workers lay tracks at a construction site of the Hangzhou-Changsha high-speed railway in Jiangshan City, east China's Zhejiang province, Jan 29, 2014. The 933-kilometer high-speed railway linking Hangzhou City and Changsha City, respectively capitals of Zhejiang province and capital of Hunan province, is designed at a top speed of 350km/h. The 295.5-kilometer rail-laying work in the Zhejiang section was completed on Wednesday after three months' hard work. Travel time will be reduced from more than six hours to four hours when the railway is put into operation, which is expected at the end of 2014. (Xinhua/Tan Jin)

    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 巢湖市| 海兴县| 长治市| 凭祥市| 高密市| 兴和县| 安化县| 疏勒县| 星子县| 三河市| 泰州市| 烟台市| 大英县| 南岸区| 四川省| 湖南省| 灵山县| 民县| 耒阳市| 孟州市| 漳浦县| 崇礼县| 新沂市| 台湾省| 新河县| 武功县| 遂溪县| 宕昌县| 兰州市| 汉源县| 张北县| 惠安县| 德庆县| 孟连| 望都县| 鹤山市| 曲靖市| 油尖旺区| 大足县| 西乡县| 宁强县|