Text: | Print| Download

    Construction of Hangzhou-Changsha high-speed railway underway (2/5)

    2014-01-29 16:02 Xinhua Web Editor:Li Yan
    1

    Workers lay tracks at a construction site of the Hangzhou-Changsha high-speed railway in Jiangshan City, east China's Zhejiang province, Jan 27, 2014. The 933-kilometer high-speed railway linking Hangzhou City and Changsha City, respectively capitals of Zhejiang province and capital of Hunan province, is designed at a top speed of 350km/h. The 295.5-kilometer rail-laying work in the Zhejiang section was completed on Wednesday after three months' hard work. Travel time will be reduced from more than six hours to four hours when the railway is put into operation, which is expected at the end of 2014. (Xinhua/Tan Jin)

    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 页游| 通州区| 栖霞市| 延庆县| 庆阳市| 古蔺县| 乳源| 彭泽县| 苍溪县| 贺兰县| 额济纳旗| 枞阳县| 荥经县| 会同县| 苍溪县| 大竹县| 肇庆市| 安远县| 康平县| 宣化县| 岑溪市| 三明市| 运城市| 英德市| 满洲里市| 波密县| 宁津县| 石嘴山市| 樟树市| 称多县| 和顺县| 全州县| 达孜县| 肥乡县| 嘉荫县| 岳阳市| 思南县| 六枝特区| 蒙山县| 林周县| 贵港市|