LINE

    Text:AAAPrint
    Society

    High-speed railway linking Hohhot with Beijing set to open

    1
    2019-12-13 09:59:49chinadaily.com.cn Editor : Li Yan ECNS App Download
    The G2405 Fuxing bullet train flashes by on Dec 11, during a test run on the high-speed railway linking Hohhot with Beijing, Dec. 11. (Photo/Inner Mongolia Daily)

    The G2405 Fuxing bullet train flashes by on Dec 11, during a test run on the high-speed railway linking Hohhot with Beijing, Dec. 11. (Photo/Inner Mongolia Daily)

    The G2405 Fuxing bullet train, departing from Beijingbei Railway Station, arrived on Dec. 11 in Hohhot, capital of North China's Inner Mongolia autonomous region -- marking the completion of the first full-line test operation for the high-speed railway linking Hohhot with Beijing.

    The high-speed rail consists of two sections: the Beijing-Zhangjiakou Intercity Railway and the Zhangjiakou-Hohhot Railway.

    After it is put into operation, some 20 pairs of CR400BF Fuxing EMU trains will run on the two lines annually.

    Hohhot, Baotou and Ulaanqab in the autonomous region will all have high-speed trains heading for Beijing. The journey between Hohhot and Beijing will be shortened from more than nine hours to two hours and 18 minutes.

    The Beijing-Zhangjiakou Intercity Railway and the Zhangjiakou-Hohhot Railway-- which will be opened and operated in accordance with the unified arrangements of China Railway -- are scheduled to start running at the end of December.

    The Zhangjiakou-Hohhot High-speed Railway, being one of the important components of the Beijing-Lanzhou High-speed Railway, has a design speed of 250 kilometers per hour. After its official launch, a great deal of comfort and convenience will be offered to passengers in the Beijing-Tianjin-Hebei area.

    The east Ulaanqab-Hohhot section of the Zhangjiakou-Hohhot Railway was officially launched in August 2017.

    Earlier in June this year, the Huai'an-Ulaanqab section of the Zhangjiakou-Hohhot Railway completed joint commissioning and started trial operations.

    As part of the 2022 Olympic Winter Games project, the Beijing-Zhangjiakou High-speed Railway started joint testing on Oct 5. The related work on the railway's joint debugging and joint testing is progressing smoothly.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2019 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 苗栗县| 仙桃市| 巴彦淖尔市| 巴东县| 科技| 瓮安县| 宁海县| 新乡县| 五家渠市| 宣化县| 明水县| 鹿邑县| 城固县| 普兰县| 商南县| 瑞丽市| 桂林市| 永福县| 芦溪县| 阿拉善盟| 张北县| 萨迦县| 漳浦县| 汽车| 荔浦县| 双辽市| 敦煌市| 闽清县| 吉木乃县| 三明市| 怀来县| 唐河县| 尖扎县| 磴口县| 郸城县| 璧山县| 门源| 商都县| 明光市| 屏南县| 霍邱县|