LINE

    Text:AAAPrint
    Video

    Last key rotor of Baihetan Hydropower Station installed

    1
    2021-12-20 19:15:38Ecns.cn Editor : Li Ji ECNS App Download

    (ECNS) -- The rotor of No. 9 generating unit of Baihetan Hydropower Station was installed on Sunday.

    So far, all 16 hydro-generating units have been installed, laying a foundation for the full operation of the hydropower station in July next year.

    Located on the upstream branch of China's Yangtze River, the Baihetan Hydropower Station straddles southwest China's Yunnan and Sichuan provinces.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2021 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 嘉善县| 绥阳县| 同江市| 名山县| 嘉鱼县| 瑞昌市| 鞍山市| 蓝山县| 洮南市| 陈巴尔虎旗| 扎鲁特旗| 东丰县| 南乐县| 达州市| 兴山县| 平江县| 南京市| 图木舒克市| 治多县| 盐津县| 虞城县| 平阳县| 武邑县| 汉沽区| 亚东县| 上杭县| 沙河市| 开封县| 萨嘎县| 哈尔滨市| 张家界市| 玉屏| 苏州市| 拜城县| 抚顺县| 福安市| 济南市| 公安县| 蓝山县| 南康市| 田阳县|