LINE

    Text:AAAPrint
    ECNS Wire

    China's first tide-light complementary photovoltaic power station put into operation

    1
    2021-12-31 16:42:28Ecns.cn Editor : Zhang Dongfang ECNS App Download

     

     

    China's first tide-light complementary photovoltaic power station is put into operation on December 29, 2021. (Photo/China News Service)
    China's first tide-light complementary photovoltaic power station is put into operation on December 29, 2021. (Photo/China News Service)

    (ECNS) -- A 110kV power transmission project of China's first tide-light complementary photovoltaic power station in Wenling, Taizhou, east China's Zhejiang Province, was put into operation Wednesday.

    Based on the first bidirectional tidal power station in China, the Jiangxia Tidal Power Station project has a photovoltaic area of about 133.3 hectares built along a river, forming coordinated tidal and photovoltaic power generation modes.

    After completion, it is expected to generate 1,092 hours of power annually within its 20 years of operation, and its annual power generation will exceed 100 million kWh.

    Compared to a thermal power plant with the same gross generation of electricity, it can save about 31,654 tons of standard coal and reduce the emission of carbon dioxide by 84,479 tons a year.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2021 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 霍州市| 娄底市| 江阴市| 许昌县| 福鼎市| 香格里拉县| 宜春市| 揭阳市| 勐海县| 康乐县| 伊川县| 长垣县| 延吉市| 元谋县| 广饶县| 政和县| 泰来县| 高邑县| 宣汉县| 平乐县| 海兴县| 长武县| 商城县| 原平市| 娄底市| 正定县| 洮南市| 遵义市| 禹城市| 贵南县| 佛学| 灵璧县| 永川市| 京山县| 英吉沙县| 涟水县| 淄博市| 黄梅县| 海南省| 吴旗县| 绵阳市|