LINE

    Text:AAAPrint
    Sci-tech

    Sichuan-Tibet Railway 'extremely challenging' project, expert says

    1
    2021-03-10 09:22:45China Daily Editor : Li Yan ECNS App Download
    Special: 2021 Two Sessions

    Track-laying takes place at a bridge on the Lhasa-Nyingchi section of the Sichuan-Tibet Railway in the Tibet autonomous region on Dec 28. The track-laying work was completed on Dec 31 for a railway linking the cities of Lhasa and Nyingchi in the Tibet autonomous region. (CHOGO/XINHUA)

    Innovations are the key to conquering difficulties in order to build the "most challenging railway project in human history "connecting Sichuan province and the Tibet autonomous region, a political adviser said during the ongoing two sessions.

    "Although China has abundant experience and capabilities in constructing all types of railways, including high-speed lines and those at high altitudes and for heavy haulage, it is insufficient to rely only on previous experience to build the Sichuan-Tibet Railway because it is extremely challenging," said Lu Chunfang, an academician of the Chinese Academy of Engineering.

    Lu, who is also a member of the National Committee of the Chinese People's Political Consultative Conference, made the remarks while answering China Daily's questions in a video interview during the ongoing fourth session of the 13th CPPCC National Committee.

    The rail line is the second to link Tibet with the rest of the country, following the Qinghai-Tibet Railway, which opened in 2006.

    Lu, the general director of the Qinghai-Tibet Railway, said the new line is much more difficult to build because of the complicated geological conditions.

    More than 90 percent of the line consists of bridges or tunnels. Six tunnels are longer than 30 kilometers. The 42.5-km Yigong tunnel will become the world's longest railway tunnel once it is completed.

    Thirty-one tunnels are more than 1 km below the ground, according to Lu.

    He also noted that nine bridges are taller than 100 meters. The tallest bridge, which will span the Nujiang River, will be 630 meters high, which is about the same height as the Shanghai Tower, China's highest skyscraper.

    Fragile ecology

    The ecological conditions in the plateau areas are extremely fragile, and the project has taken careful planning and calibrated protective measures into consideration from the very beginning.

    Engineers have turned to technological and managerial innovations to address challenges arising during the construction process, Lu noted.

    Smart software to select the best routes to lay tracks has been developed and used in the project.

    A State-level innovation center for the construction of the line will be established soon, conducting research to solve technological problems, he said.

    In addition, a digital management platform, which integrates construction, safety and environmental management, has been developed.

    An integrated mechanism to apply lab results to construction of the railway has also been developed.

    The 1,838-km Sichuan-Tibet Railway has three sections. The Chengdu-Ya'an section in Sichuan opened in December 2018. Construction of the Lhasa-Nyingchi section in Tibet started in 2015 and is still underway. Construction of the middle section, the most difficult part of the line, between Ya'an in Sichuan and Nyingchi in Tibet, started in November.

    The 1,011-km Ya'an-Nyingchi section, with a designed speed of 120 to 200 km per hour, passes through the Sichuan Basin, the Yunnan-Guizhou Plateau and the Qinghai-Tibet Plateau, climbing from 600 meters above sea level to nearly 4,500 meters.

    In an instruction made at the start of construction of the Ya'an-Nyingchi section in November, President Xi Jinping said that construction of the project will face rarely seen difficulties because of geological conditions, the complex climate along the railway and the fragile environment.

    Upon completion, it will boost the development of Tibet and reduce the travel time between Chengdu and Lhasa, the capital cities of Sichuan and Tibet, to about 13 hours from more than 40 now.

    "Once completed, the railway's capacity will be greater than the Qinghai-Tibet Railway, and it will also be the most convenient rail corridor to Tibet. The transportation of people and cargo will greatly increase and boost local development," Lu said.

    The date of the railway's planned completion has yet to be revealed.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2021 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 肇庆市| 麟游县| 叶城县| 壤塘县| 榕江县| 电白县| 蚌埠市| 黔西| 山东| 广东省| 山东省| 城固县| 万年县| 武功县| 志丹县| 永济市| 长垣县| 贺州市| 蒙自县| 邢台市| 集安市| 辽宁省| 樟树市| 徐州市| 郎溪县| 都江堰市| 赫章县| 富民县| 绿春县| 磐安县| 绥滨县| 哈密市| 永仁县| 克山县| 张家界市| 靖宇县| 雅江县| 渭源县| 甘德县| 双牌县| 高尔夫|