LINE

    Text:AAAPrint
    Politics

    Korean peninsula makes tracks toward peace

    1
    2019-01-08 08:15:13China Daily Editor : Li Yan ECNS App Download

    Series of overtures advanced harmonious relations in 2018

    A nine-car train carrying 100 passengers departed from Seoul, capital of the Republic of Korea, at 6:45 am on Dec 26 for Panmun station in Kaesong, a border city in the Democratic People's Republic of Korea

    It was the first time an ROK train had run on the Kumgang-Tumen line since the Korean War (1950-53). The line runs up from Mount Kumgang to the Tumen River.

    The train arrived to cheers and music, and carried a slogan on its side that read, "Let's open an era of peace and prosperity together."

    The 100 passengers included government officials, lawmakers and aging relatives separated by the war. They witnessed the unveiling of a project to reconnect the two countries by rail, heralded by ROK President Moon Jae-in as "the beginning of a wide range of exchanges and cooperation".

    Moon and top DPRK leader Kim Jong-un held a landmark summit in April, at which they agreed to modernize and eventually link the northern and southern parts of the Gyeongui Line, which runs along the west coast of the Korean Peninsula, and the Donghae Line, on the east coast, as well as roads that span the border along the two coasts.

    The difference between the rail networks in the DPRK and ROK is striking. When he met with Moon in April, Kim conceded his country's trains were in an "embarrassing" state. Some commentators said modernizing the DPRK's rail lines to bring them up to international standards could take years or decades and would require billions of dollars in investment.

    Freight services began operating in 2007 between Munsan station in the ROK and Panmun station in the DPRK to support operations at a now-shuttered joint factory park in Kaesong. The ROK used the trains to move construction materials north, while clothing and shoes made at the factory park were sent south. The line stopped operating in 2008 due to nuclear tensions between the countries.

    Moon has said many times that better inter-Korean relations would reduce tensions, and that joint projects to improve the DPRK's infrastructure are an investment in the future of the Korean Peninsula, which could be of great benefit to both sides in the long term.

    Since taking office in late 2011, Kim has pushed for market-oriented economic development. At the Third Plenary Session of the Seventh Workers' Party of Korea Central Committee in April, he said the WPK would "concentrate all efforts of the whole party and country on socialist economic construction".

    At his first meeting with Kim, Moon reportedly laid out his plans for the DPRK's development on a USB memory stick.

    Ultimately, the ROK wants to see a high-speed rail line linking Seoul and Pyongyang, the DPRK capital, and extending north to Sinuiju, an important trade hub on the Chinese border.

    At the Moon-Kim summit, both sides agreed that better roads and railways, and the ability to move goods and people quickly and reliably, would help boost economic activity. They also agreed to work together to improve roads and railways in the eastern transportation corridor from Pyongyang to Sinuiju.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    News
    Politics
    Business
    Society
    Culture
    Military
    Sci-tech
    Entertainment
    Sports
    Odd
    Features
    Biz
    Economy
    Travel
    Travel News
    Travel Types
    Events
    Food
    Hotel
    Bar & Club
    Architecture
    Gallery
    Photo
    CNS Photo
    Video
    Video
    Learning Chinese
    Learn About China
    Social Chinese
    Business Chinese
    Buzz Words
    Bilingual
    Resources
    ECNS Wire
    Special Coverage
    Infographics
    Voices
    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2019 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 黑河市| 贵定县| 新巴尔虎右旗| 房山区| 东丽区| 茶陵县| 乌什县| 应城市| 承德县| 林口县| 安平县| 四子王旗| 西城区| 安达市| 南康市| 巨野县| 莱芜市| 定南县| 商都县| 安达市| 山丹县| 郁南县| 虎林市| 永新县| 淮南市| 东城区| 阿克陶县| 永顺县| 抚宁县| 广东省| 屯门区| 上饶县| 阿坝县| 大田县| 绵阳市| 海晏县| 迭部县| 左云县| 万荣县| 万年县| 高淳县|