LINE

    Text:AAAPrint
    Photo

    New Baishatuo Yangtze River railway bridge completed(2/6)

    2018-01-11 13:57 Xinhua Editor:Li Yan
    1

    The New Baishatuo Yangtze River railway bridge (upper) is seen with the previous Baishatuo Yangtze River railway bridge in Jiangjin of southwest China's Chongqing Municipality, Jan. 9, 2018. The construction of the new double decker steel truss cable stay railway bridge was finished recently. It has 4 tracks on the upper deck for passenger trains with a designed speed of 200 meters per hour and 2 tracks on the lower deck for cargo trains with the designed speed of 120 kilometers per hour. The overall length of the bridge is 5.32 kilometers, of which the main bridge is 920 meters. Together with the Chongqing-Guiyang railway, which is to be in operation, the bridge will undergo the test operation soon. (Xinhua/Liu Chan)

    Prev Button Next Button
    LINE
    News
    Politics
    Business
    Society
    Culture
    Military
    Sci-tech
    Entertainment
    Sports
    Odd
    Features
    Biz
    Economy
    Travel
    Travel News
    Travel Types
    Events
    Food
    Hotel
    Bar & Club
    Architecture
    Gallery
    Photo
    CNS Photo
    Video
    Video
    Learning Chinese
    Learn About China
    Social Chinese
    Business Chinese
    Buzz Words
    Bilingual
    Resources
    ECNS Wire
    Special Coverage
    Infographics
    Voices
    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 高安市| 鄂尔多斯市| 光山县| 济阳县| 望江县| 贵德县| 江津市| 阿克陶县| 曲阜市| 固阳县| 婺源县| 江陵县| 普洱| 达拉特旗| 陈巴尔虎旗| 集安市| 兰西县| 南乐县| 武汉市| 台州市| 淳安县| 通道| 甘洛县| 理塘县| 德安县| 延寿县| 德令哈市| 来凤县| 深泽县| 涪陵区| 扎兰屯市| 临泽县| 东宁县| 新丰县| 阿鲁科尔沁旗| 故城县| 奉节县| 澳门| 贺兰县| 永德县| 额敏县|