Text: | Print| Download

    Xinjiang-Lanzhou high-speed railway test run (2/9)

    2014-06-05 14:48 China.org.cn Web Editor:Li Yan
    1

    The wind break project on the Dabancheng Wetlands Railway Bridge helps railway facilities withstand high winds of up to 17 meters per second (Gale 7) . The wind break project is 462 km long, accounting for 65 percent of the total length of Xinjiang Section, including 345 km wind break walls on the surface and 95 km wind break barriers on bridge. [Photo by Chen Boyuan/China.org.cn]

    Video
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 枞阳县| 平江县| 连平县| 兴宁市| 安徽省| 宣威市| 巴里| 通山县| 商洛市| 定远县| 韶关市| 惠东县| 丹寨县| 新丰县| 利川市| 蒙城县| 馆陶县| 丹阳市| 哈巴河县| 温宿县| 铅山县| 大名县| 盐源县| 灌云县| 江孜县| 长葛市| 综艺| 池州市| 榆社县| 武宣县| 凉山| 大同市| 汤阴县| 皋兰县| 高尔夫| 长宁区| 黑龙江省| 甘孜县| 班戈县| 略阳县| 岳普湖县|