LINE

    Text:AAAPrint
    Video

    Drilling completes on high-speed rail tunnel through Hubei karst landscape

    1
    2021-04-14 15:13:53Ecns.cn Editor : Ji Xiang ECNS App Download

    (ECNS) -- With a total length of 5,506 meters, Gaojiaping tunnel of Zhengzhou-Wanzhou high-speed railway (Zhengwan high-speed railway) completed drilling on Monday after 4 years.

    The tunnel in Nanzhang County, Xiangyang City of Hubei Province, passes through a karst landscape featuring the most complicated geological conditions in China.

    There are karst depressions, sink holes and corrosion grooves on the surface of the tunnel. The rock mass here is broken and there are many karst caves and corrosion fissures in the limestone area, which are prone to geological disasters like water intrusion and mudslides.

    There is also gas in the tunnel, making the construction extremely difficult. It has become a demonstration project of high-speed railway tunnels in China.

    With a total length of 818 kilometers, Zhengwan high-speed railway connects Zhengzhou, capital of Henan Province and Wanzhou District of Chongqing.

    As an essential part of the Beijing-Kunming channel of Chinese high-speed railway networks, it will promote the development of tourism resources in the Three Gorges area and Yangtze River Economic Belt construction.

    It is expected to open to the traffic in 2022, which will shorten the journey from Xiangyang to Chongqing and Zhengzhou to less than two hours.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2021 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 米易县| 克拉玛依市| 鄂伦春自治旗| 绥德县| 钟祥市| 天峻县| 九江市| 保山市| 南和县| 大宁县| 陈巴尔虎旗| 内黄县| 四会市| 钟山县| 临澧县| 嵊泗县| 房山区| 元阳县| 宁德市| 江源县| 正定县| 都匀市| 宁国市| 华池县| 五莲县| 东乌珠穆沁旗| 沽源县| 垫江县| 柳河县| 竹溪县| 麦盖提县| 信阳市| 美姑县| 南皮县| 漳平市| 永兴县| 璧山县| 湖南省| 汝城县| 灌阳县| 会东县|