LINE

    Text:AAAPrint
    Video

    2600-ton building successfully shifts 76 meters

    1
    2020-06-12 14:40:32Ecns.cn Editor : Li Ji ECNS App Download

    (ECNS)--A 2,600-ton Catholic building in Jinan, Shandong Province was successfully shifted 76 meters from its original site after 82 minutes of effort on wednesday.

    The three-storey structure was moved 50 meters eastward and 26 meters northward after being rotated 20 degrees on ten giant hydraulic platform trailers.

    The century-old building, a cultural site protected at city level, will be renovated.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2020 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 阜康市| 宜昌市| 交城县| 泸水县| 梁平县| 扶余县| 麦盖提县| 广灵县| 会理县| 连江县| 南充市| 米林县| 麦盖提县| 义马市| 桃源县| 雅江县| 梁平县| 林周县| 南木林县| 皮山县| 会理县| 松滋市| 信丰县| 庆安县| 杭锦旗| 开原市| 涿州市| 台江县| 云霄县| 阿拉尔市| 富顺县| 分宜县| 延川县| 翼城县| 玛多县| 赤峰市| 芜湖市| 嘉禾县| 边坝县| 城固县| 宜兰县|