LINE

    Text:AAAPrint
    Video

    Electricians brave snow, permafrost in world's highest-altitude grid project

    1
    2020-01-02 17:15:11Ecns.cn Editor : Li Yuxin ECNS App Download

    (ECNS) -- Electricians have braved snow and freezing conditions in the world's highest power transmission and transformation project in Tibet Autonomous Region.

    With a total length of 1,689 km, the project, which runs from Xigaze City to Ali Prefecture, stretches across permafrost, no man's land and swamps.

    With towers at an average altitude of 4572 meters, the project is said to be an extremely difficult "power heaven road."

    Connecting 10 Tibetan counties, it will improve reliability of power supply across Ali Prefecture.

    The project, started in September 2019, is planned to complete in 2021.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2020 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 新安县| 兴海县| 九台市| 成武县| 屯昌县| 兰溪市| 古交市| 厦门市| 开远市| 洮南市| 怀集县| 桂平市| 聂荣县| 昭平县| 南澳县| 珠海市| 闽清县| 额尔古纳市| 贵港市| 莱阳市| 衡阳县| 遂昌县| 五大连池市| 恭城| 聂荣县| 理塘县| 交口县| 内江市| 繁昌县| 安康市| 任丘市| 宾阳县| 静海县| 四平市| 尉氏县| 平江县| 慈利县| 潼南县| 娄底市| 双辽市| 永吉县|