LINE

    Text:AAAPrint
    Sports

    Renovation of 'Water Cube' for Beijing 2022 completed

    1
    2020-11-27 23:06:33Xinhua Editor : Wang Fan ECNS App Download

    The renovation of the National Aquatics Center, known as "Water Cube," was completed on Friday, making it the first venue ready for the Beijing Winter Olympic Games, according to the Beijing Major Projects Construction Headquarters Office.

    The renovation work involved construction, waterproofing, membrane maintenance and other engineering fields, with an area of about 50,000 square meters.

    One of the difficulties to the renovation was to build a convertible structure and install a detachable ice making system in the middle of the competition hall to form a curling field with four standard tracks. After many rounds of tests, the plan of "water ice conversion" found success, enabling conversion materials to be reused, and the transformation cost to be effectively reduced.

    The venue has already launched "water ice conversion" for a second time and will be open to the public after the ice production at the site is completed.

    For the sustainable operation of the venue, the "Water Cube" also uses the underground space of South Square to construct two pieces of ice. One is a standard rink and the other is a curling venue. It will be open to the public as a curling experience base in the central area of Beijing's Olympic Park.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2020 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 沙湾县| 敦化市| 青浦区| 巨鹿县| 哈密市| 林周县| 乌兰察布市| 贵阳市| 甘肃省| 张家口市| 颍上县| 长寿区| 四会市| 成安县| 滦南县| 耒阳市| 峡江县| 芜湖市| 丽水市| 定远县| 裕民县| 辰溪县| 文水县| 新民市| 伊宁县| 时尚| 平潭县| 沧源| 永顺县| 新民市| 屏边| 贺兰县| 左云县| 延边| 罗田县| 江北区| 仲巴县| 瑞昌市| 柘城县| 五指山市| 望谟县|