LINE

    Text:AAAPrint
    Sci-tech

    China's self-developed 10-MW offshore wind turbine starts operation

    1
    2020-07-14 09:54:07Xinhua Editor : Li Yan ECNS App Download
    An offshore wind turbine with a capacity of 10 MW is under construction on June 12, 2020. (Photo/Xinhua)

    An offshore wind turbine with a capacity of 10 MW is under construction on June 12, 2020. (Photo/Xinhua)

    An offshore wind turbine with a capacity of 10 MW started operating Sunday in east China's Fujian Province, according to Dongfang Electric Corporation (DEC), the turbine's manufacturer based in the southwestern city of Chengdu.

    It is estimated that the wind energy converter, jointly developed by DEC and China Three Gorges Corporation, can produce 40 million kWh of clean energy every year at an average wind speed of 10 meters per second.

    An offshore wind turbine with a capacity of 10 MW is under construction on June 12, 2020. (Photo/Xinhua)
    An offshore wind turbine with a capacity of 10 MW is under construction on June 12, 2020. (Photo/Xinhua)

    The annual power output can support the average electricity consumption of 20,000 households of three members in a year. The turbine will reduce coal use by 13,000 tonnes and cut carbon dioxide emission by 35,000 tonnes.

    According to DEC, the wind turbine has set a new record for China's unit capacity of offshore wind turbines and is expected to be put into mass production in the near future. 

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2020 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 马边| 凤冈县| 蓝山县| 镇雄县| 清涧县| 桑植县| 晋中市| 永德县| 天水市| 沂水县| 二手房| 舒兰市| 南城县| 公安县| 金门县| 周口市| 嘉峪关市| 麦盖提县| 务川| 佛冈县| 金堂县| 镇江市| 仪征市| 苗栗市| 大邑县| 莱阳市| 库尔勒市| 合山市| 正镶白旗| 大足县| 曲阳县| 平果县| 肇东市| 淅川县| 久治县| 马边| 台南县| 无为县| 年辖:市辖区| 高阳县| 塔城市|