LINE

    Text:AAAPrint
    Economy

    Yangtze set to become a 'highway on the water'(3)

    1
    2018-08-08 10:36:05China Daily Editor : Mo Hong'e ECNS App Download
    A cruise liner carries passengers along an upstream section of the Yangtze River. (Photo/China Daily)

    A cruise liner carries passengers along an upstream section of the Yangtze River. (Photo/China Daily)

    Special: Yangtze River Economy

    Dredging operation

    In addition to ship design, another bottleneck for deep-draft vessels heading to Wuhan along the Yangtze are the shallow shoals along the middle reaches of the river, which mean large vessels can only sail upstream during the flood season, which normally lasts from July to August.

    For vessels with a displacement of 10,000 tons, like Wu's, to pass safely, the water must be at least 6 meters deep. However, the depth on many stretches of the Yangtze downstream from Wuhan to Anqing, Anhui province, is 4.5 meters during winter.

    That means the route is only suitable for vessels with a displacement of 5,000 tons, according to Tang Guanjun, director of the Changjiang (Yangtze) River Administration of Navigational Affairs.

    The administration, which is under the jurisdiction of the Ministry of Transport, oversees river transportation and coordinates waterway construction across several provinces along the Yangtze.

    "If we can solve the problem of navigational depth, the Yangtze River route will become a 'highway on the water'," Tang said, quoted by the China Shipping website. "And Wuhan can play an important role in achieving that goal."

    Project 645-the process of dredging the Yangtze to increase the depth of the waterway between Wuhan to Anqing to 6 meters, and to 4.5 meters from Wuhan to Yichang, a city upstream-is the key to the problem.

    The project has been listed in the 13th Five-Year Plan (2016-2020), the top social and economic development initiative issued by the State Council, China's Cabinet.

    According to Wang Yanghong, director and Party chief of the Port and Shipping Administration Bureau of Hubei province, dredging work started on the first leg of the project, a 16-km stretch in Hubei's Qichun county, in November.

    Meanwhile, work on the 12 other legs, running from Wuhan to Anqing, will start as early as October.

    "The dredging of the Qichun leg will be finished by the end of 2019," Wang said.

    "By 2020, when the whole project is completed, Wuhan will see 10,000-ton ships using its ports all year round."

    ?

    ?

    ?

    ?

    ?

    ?

      

    Related news

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    News
    Politics
    Business
    Society
    Culture
    Military
    Sci-tech
    Entertainment
    Sports
    Odd
    Features
    Biz
    Economy
    Travel
    Travel News
    Travel Types
    Events
    Food
    Hotel
    Bar & Club
    Architecture
    Gallery
    Photo
    CNS Photo
    Video
    Video
    Learning Chinese
    Learn About China
    Social Chinese
    Business Chinese
    Buzz Words
    Bilingual
    Resources
    ECNS Wire
    Special Coverage
    Infographics
    Voices
    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ?1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 潜山县| 湟源县| 阿克陶县| 武强县| 抚顺市| 桓台县| 微山县| 鄂尔多斯市| 林甸县| 华安县| 康定县| 佳木斯市| 武山县| 和静县| 望城县| 成都市| 剑阁县| 惠来县| 城固县| 扶风县| 永州市| 安顺市| 织金县| 莱州市| 文登市| 蓝山县| 南康市| 商河县| 商城县| 白水县| 榆社县| 万山特区| 措美县| 江油市| 北川| 汉阴县| 东乌珠穆沁旗| 怀柔区| 宁乡县| 吴旗县| 石林|