LINE

    Text:AAAPrint
    Culture

    Palace Museum northern branch expected to be completed by October

    2025-01-06 09:15:01Global Times Editor : Li Yan ECNS App Download

    Construction of the northern branch of the Palace Museum, a major extension of Beijing's most iconic museum facility, is one of the main cultural projects in Beijing in 2025, as it is expected to be completed by October.

    The new branch, covering over 100,000 square meters, is now at a stage in which its main structure is going through a construction phase, with main buildings within the new branch gradually taking shape. 

    The exterior of the branch's buildings is adorned with red walls, golden tiles and double-eaved roofs to match the Palace Museum's architectural aesthetics. 

    Once completed, the northern extension will provide an expanded space for the Palace Museum's cultural relic restoration projects. 

    According to Du Haijiang, deputy director of the Palace Museum, thousands of cultural relics will be repaired here once it is built. 

    Also, special cultural relics with stringent requirements for their exhibition environment such as calligraphic works, textiles and paintings, will undergo much better restoration in the new branch. 

    The Palace Museum currently houses over 1.86 million cultural relics.

    To better preserve such relics, pioneering building techniques are being used for the new northern branch, with a focus on stability. 

    The branch's building has a solid and stable appearance, and more than 300 seismic isolation components will be installed in the later stages, achieving multi-dimensional and multi-point composite seismic reduction effects. 

    Modern high-tech materials will also be used in the construction. 

    For example, the concrete used in the buildings of the branch incorporates biomimetic self-healing technology. 

    When cracks smaller than 0.6 millimeters form, this advanced concrete will be able to "repair" itself, greatly enhancing the longevity of the structures. 

    "The innovative aluminum alloy roofing maintains the traditional architectural style while ensuring that the structures remain visually appealing for many years," Li Yun, a national first-class registered structural engineer, told the Global Times. 

    Restoration of relics is not the branch's sole goal. 

    Once completed, the new facility will feature 12 exhibition halls built with high-tech designs, covering approximately 35,000 square meters. 

    Between 20,000 and 30,000 of the Palace Museum's cultural relics will be displayed at the new site every year. 

    Related news

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2025 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 商水县| 翁源县| 肥东县| 赣榆县| 乌拉特中旗| 台北县| 榆林市| 壤塘县| 象山县| 宜城市| 丰镇市| 阳春市| 嘉鱼县| 鹰潭市| 聊城市| 黄石市| 东平县| 兖州市| 从化市| 诏安县| 建昌县| 册亨县| 富锦市| 丘北县| 宣城市| 修文县| 凤阳县| 大化| 古蔺县| 浮梁县| 刚察县| 嘉鱼县| 开阳县| 体育| 翼城县| 托克托县| 瑞金市| 休宁县| 阜阳市| 普陀区| 清流县|