LINE

    Text:AAAPrint
    ECNS Wire

    China's 350-kph Fuxing bullet trains to go driverless

    1
    2019-01-03 12:35:46Ecns.cn Editor : Mo Hong'e ECNS App Download
    An extended version of the Fuxing bullet train at the China National Railway Test Center in Beijing. With a design speed of 350 kilometers per hour, the new train is 439.8 meters long with 17 carriages, which can carry 1,283 passengers. It will be put into use on the Beijing-Shanghai high-speed railway next year. (Photo/VCG)

    An extended version of the Fuxing bullet train at the China National Railway Test Center in Beijing. With a design speed of 350 kilometers per hour, the new train is 439.8 meters long with 17 carriages, which can carry 1,283 passengers. It will be put into use on the Beijing-Shanghai high-speed railway next year. (Photo/VCG)

    (ECNS) -- China Railway Corp said on Wednesday that they are planning to apply the automatic train operation (ATO) system to high-speed trains on the Beijing-Zhangjiakou railway line, the world’s first such application.

    Lu Dongfu, general manager of China Railway Corp, said the application of ATO on Fuxing bullet trains, which run at speeds of 350 kilometers per hour, will mark a milestone in the history of train technology.

    China's current fast trains are all driven by humans aided by the Chinese Train Control System (CTCS), sources at the China Academy of Railway Sciences told the Science and Technology Daily.

    ATO will increasingly be used to replace human train drivers after its successful application in subway trains and two inter-city railway lines in the Pearl River Delta region, which run at a maximum speed of 200 kilometers per hour.

    ATO was capable of carrying out all human driver operations, including startup, acceleration and deceleration, stopping, and train door opening.

    According to experts, automated train driving can help ensure travel runs as scheduled, overcome variables created by human drivers, and improve transport capacity.

    In 94 days from June to September last year, high-speed test trains on the Beijing-Shenyang line, traveling at maximum speeds of 350 kilometers per hour, completed a total of 186,397 kilometers using automatic driving.

    Related news

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    News
    Politics
    Business
    Society
    Culture
    Military
    Sci-tech
    Entertainment
    Sports
    Odd
    Features
    Biz
    Economy
    Travel
    Travel News
    Travel Types
    Events
    Food
    Hotel
    Bar & Club
    Architecture
    Gallery
    Photo
    CNS Photo
    Video
    Video
    Learning Chinese
    Learn About China
    Social Chinese
    Business Chinese
    Buzz Words
    Bilingual
    Resources
    ECNS Wire
    Special Coverage
    Infographics
    Voices
    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2019 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 安龙县| 牙克石市| 东宁县| 元阳县| 睢宁县| 两当县| 临颍县| 江口县| 五原县| 南阳市| 慈利县| 清水县| 翼城县| 卢湾区| 齐河县| 湖州市| 延津县| 平和县| 容城县| 南投县| 思茅市| 施秉县| 广州市| 东辽县| 乌什县| 金乡县| 公主岭市| 黄龙县| 福鼎市| 平安县| 南江县| 兴和县| 阳东县| 兴安盟| 焦作市| 乐业县| 灵台县| 甘肃省| 楚雄市| 绥江县| 鄯善县|