LINE

    Text:AAAPrint
    Society

    China may meet solar, wind goals five years earlier

    2023-04-04 08:52:35China Daily Editor : Li Yan ECNS App Download

    State Grid employees check solar power panels in the Tibet autonomous region. (Photo by Song Weixing/For chinadaily.com.cn)

    China may reach its 2030 target for wind and solar energy development five years earlier than planned.

    Prefecture-level regions have planned to increase installed capacity for wind and solar energy by at least 800 million kilowatts during the 14th Five-Year Plan period (2021-25), according to research conducted by the Institute of Public and Environmental Affairs and the Chinese Research Academy of Environmental Sciences.

    This means that China may be able to beat its target of increasing installed capacity for these two forms of renewable energy to 1.2 billion kW five years earlier than scheduled.

    The target was outlined in a State Council circular on implementation plans for the development of new energy unveiled last May.

    The total capacity of renewable energy generation in China — including hydro, wind, solar and biomass — reached 1.2 billion kW at the end of last year, up by 2.5 percentage points on 2021, according to the National Energy Administration.

    This indicates that the national capacity for renewable energy has overtaken coal for the first time in a historic catch-up.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2023 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網(wǎng)上傳播視聽(tīng)節(jié)目許可證(0106168)] [京ICP證040655號(hào)]
    [京公網(wǎng)安備 11010202009201號(hào)] [京ICP備05004340號(hào)-1]
    主站蜘蛛池模板: 科尔| 将乐县| 赞皇县| 柘城县| 松滋市| 卫辉市| 温宿县| 阿巴嘎旗| 十堰市| 廊坊市| 泰顺县| 桐城市| 霞浦县| 阿巴嘎旗| 凤台县| 沙湾县| 和田县| 六盘水市| 姚安县| 三原县| 保康县| 怀安县| 精河县| 上蔡县| 武强县| 茌平县| 鸡泽县| 汝城县| 乌鲁木齐县| 新河县| 色达县| 长治市| 社旗县| 罗平县| 陇南市| 通渭县| 哈巴河县| 霍城县| 苗栗市| 白水县| 礼泉县|