LINE

    Text:AAAPrint
    Society

    Toughest sections yet to be built in Sichuan-Tibet railway

    1
    2021-03-09 15:43:13chinadaily.com.cn Editor : Li Yan ECNS App Download
    Special: 2021 Two Sessions

    Photo taken on Dec 23, 2018 shows a construction site on the Lhasa-Nyingchi section of the Sichuan-Tibet Railway in Southwest China's Tibet autonomous region. (Photo/Xinhua)

    Two sections of the railway connecting Sichuan province and the Tibet autonomous region are expected to start construction before June, a political adviser said on Sunday.

    Lu Chunfang, an academician of the Chinese Academy of Engineering, said sections will link Ya'an and Xinduqiao in Sichuan province and Bomi and Nyingchi in Tibet and are inviting public bidding right now.

    Lu described the Sichuan-Tibet railway as the most challenging railway construction project in human history.

    "Although China has abundant experiences in constructing all types of railways, including high-speed and railways at high altitude and carrying heavy hauls, it is insufficient to only rely on previous experiences to build the Sichuan-Tibet railway," he said, adding that innovations are the key to solving difficulties.

    Lu, a member of the Chinese People's Political Consultative Conference National Committee, made the remarks via a video interview on the sidelines of the ongoing fourth session of the 13th CPPCC National Committee.

    As the general director of the Qinghai-Tibet railway, the first railway to Tibet, he said the new line is more difficult because of more complicated geological conditions, posing extreme difficulties upon construction.

    The 1,838-km Sichuan-Tibet railway has three parts. The Chengdu-Ya'an section opened in December 2018. The Lhasa-Nyingchi section started construction in 2015 and is still underway. The middle section between Ya'an in Sichuan and Nyingchi in Tibet is the most difficult part and started construction in November, last year.

    The two sections, which are expected to start construction before June, belong to the middle section of the line.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2021 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 周口市| 海淀区| 开原市| 隆回县| 浦县| 南岸区| 虎林市| 龙陵县| 奉贤区| 库尔勒市| 咸丰县| 姚安县| 施秉县| 龙陵县| 理塘县| 陆良县| 宜兰县| 达日县| 洪雅县| 万宁市| 治多县| 景德镇市| 东平县| 高淳县| 恭城| 贵港市| 鄂托克前旗| 宁都县| 宣威市| 大宁县| 洪雅县| 隆林| 淮安市| 莱阳市| 开平市| 大宁县| 龙南县| 怀化市| 宣武区| 积石山| 肇东市|