Friday May 25, 2018
    Home > News > Military
    Text:| Print|

    Group army's weaponry combat readiness rate hits 96%

    2013-02-20 14:34 China Military Online     Web Editor: Mo Hong'e comment

    The reporters of the PLA Daily recently saw at a digitalized vehicle and artillery field of an armored brigade under a group army of the Lanzhou Military Area Command (MAC) of the Chinese People's Liberation Army (PLA) that an intelligent detector rapidly scanned the slush-ridden No.102 infantry fighting vehicle (IFV) on a "physical examination" platform, and a "health" assessment and maintenance item list came out of a printer immediately…

    With the establishment of information-based equipment support system, the equipment support mode of the troop units of the group army has realized transitions from extensiveness to intensiveness and from experience to science, and the performance of the weaponry and equipment has on the whole maintained a healthy condition of being able to fight at any time, according to a leader of the group army.

    The group army introduced modern management concept and advanced techniques, such as ultrasonic monitoring and spectrum analysis, and built an integrated information system covering all the equipment services and realized real-time search for various equipment support information in peacetime as well as effective and rapid equipment detection, diagnosis and maintenance in wartime based on an integrative command platform. To further improve the support efficiency, the group army carried out technical cooperation with 12 colleges, factories and scientific research institutes to scientifically regulate maintenance standards and procedures of information-based equipment. Meanwhile, with a view to enhancing its systematic combat capability, it carried out information-based technical upgrading and transformation of its outdated equipment and deeply implemented a new organic and systematic equipment maintenance mechanism.

    The on-site meeting on general equipment maintenance and management of the PLA was held in the group army recently. At the equipment command and support center, with a click of the mouse, various equipment performance and maintenance preplans were clear at a glance and the maintenance network support antenna was directly connected to the terminal. It is learnt that the serviceability rate, the self-support rate and the combat readiness rate of various weaponry and equipment of the group army currently remain at over 96 percent.

    Comments (0)

    Copyright ©1999-2011 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 松阳县| 西丰县| 奈曼旗| 来安县| 枞阳县| 长泰县| 定结县| 当阳市| 塘沽区| 怀柔区| 延边| 新巴尔虎右旗| 名山县| 彭山县| 东安县| 宁海县| 鄂伦春自治旗| 宁阳县| 安义县| 昌图县| 泸西县| 汉川市| 张家川| 青海省| 晋宁县| 岑溪市| 姜堰市| 吴江市| 福贡县| 天镇县| 独山县| 旅游| 扶沟县| 蒲江县| 行唐县| 沁水县| 太和县| 五大连池市| 布拖县| 平安县| 揭西县|