LINE

    Text:AAAPrint
    Photo

    Maerdang Hydropower Station under construction in Qinghai(1/8)

    2022-07-21 10:30:51 Ecns.cn Editor :Li Yan

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Located at 5,000 meters of the upper reaches of the Yellow River, the Maerdang Hydropower Station is the largest hydropower station with the highest altitude. The station has a total installed capacity of 2.2 million kilowatts. Once fully operational, It will generate an average of more than 7.304 billion kilowatt-hours of electricity every year, reducing carbon dioxide emissions by 8.16 million tons. It is expected to put into operation in March 2024.

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    Photo shows the construction site of the Maerdang Hydropower Station in Maqen County, Guoluo Tibetan Autonomous Prefecture, Qinghai Province, July 20, 2022. (Photo: China News Service/Ma Mingyan)

    LINE
      ${visuals_2}
      ${visuals_3}
      ${new_video_hd2}
      ${new_video_hd3}
    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2022 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 普定县| 深泽县| 忻州市| 西宁市| 尉氏县| 射洪县| 六安市| 贵南县| 娄底市| 安西县| 文安县| 淳安县| 泰安市| 分宜县| 保山市| 乐东| 永吉县| 赣州市| 禹城市| 铁岭县| 浙江省| 南开区| 甘孜县| 滨州市| 永安市| 澎湖县| 佛冈县| 全椒县| 镇坪县| 栾川县| 准格尔旗| 城市| 阳新县| 新竹县| 南平市| 盐亭县| 瑞丽市| 涿鹿县| 五常市| 潜江市| 上思县|