全長約30.2公里,總投資約200億元人民幣的深圳地鐵7號線,23日上午全面動工,屬深圳市軌道交通建設(shè)的三期工程,項目計劃工期53個月,預計2016年底前全線開通試運營。將經(jīng)過著名的繁華街道華強北。
Shenzhen (CNS) -- Construction of metro line 7 in the southern city of Shenzhen got underway on Tuesday. The line is designed to span 30.2 kilometers and scheduled to go into full operation by the end of 2016, with a total investment of 20 billion yuan (US$3.2 billion).
The project will be carried out by Shenzhen Metro Group Co., Ltd. and Sinohydro Group Ltd.
The line will have 28 stations connecting the areas of Xili, Longzhu, Futian South, Huaqiang North, Sungang, Tianbei and Buxin, covering the southern half of some of Shenzhen's main residential and business areas. The whole line will be underground.
At present, the length of Shenzhen's city rail is the longest in the country behind Shanghai, Beijing and Guangzhou. It is expected to have 10 metro lines with a total length of 348 km by 2016.
全長約30.2公里,總投資約200億元人民幣的深圳地鐵7號線,23日上午全面動工,屬深圳市軌道交通建設(shè)的三期工程,項目計劃工期53個月,預計2016年底前全線開通試運營。將經(jīng)過著名的繁華街道華強北。
Copyright ©1999-2011 Chinanews.com. All rights reserved.
Reproduction in whole or in part without permission is prohibited.