LINE

    Text:AAAPrint
    Business

    Russian gas pipeline ‘Power of Siberia’ fully completed

    2022-12-23 07:55:55Xinhua Editor : Li Yan ECNS App Download

    A new gas field and a new pipeline section were connected on Wednesday to Russia's Power of Siberia pipeline, indicating full completion of the major gas route.

    The 800-km long new section will transit gas from the Kovykta gas condensate field in the Irkutsk region to the Chayanda field in the Republic of Sakha before joining the preexisting part of the Power of Siberia pipeline.

    "This (new) section will complement the Power of Siberia main gas pipeline, thereby bringing our most important gas transportation route into operation throughout its entire length. It will exceed 3,000 km," Russian President Vladimir Putin said via video link at the commissioning ceremony for the Kovykta field and the Kovykta-Chayanda section of the Power of Siberia pipeline.

    According to the Kremlin, the Kovykta field has a reserve of 1.8 trillion cubic meters of natural gas and 65.7 million tons of gas condensate.

    The Power of Siberia pipeline, or the Russian section of the China-Russia east-route natural gas pipeline, started its construction in 2014 and stretches across the Irkutsk region and the Amur region in the Russian Far East before reaching the border city of Blagoveshchensk. 

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2022 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 龙州县| 大冶市| 盘锦市| 津南区| 洪江市| 宜都市| 太保市| 仙桃市| 化州市| 左权县| 靖安县| 双峰县| 岳阳市| 夏邑县| 留坝县| 天全县| 新兴县| 治县。| 曲沃县| 梓潼县| 汕头市| 遂川县| 明溪县| 综艺| 云阳县| 南部县| 双辽市| 米泉市| 惠安县| 华亭县| 姜堰市| 湟中县| 金乡县| 梅河口市| 江油市| 镇安县| 和林格尔县| 崇左市| 杂多县| 乌恰县| 康保县|