LINE

    Text:AAAPrint
    Business

    Hydropower giant goes fully online

    2022-12-21 08:16:19China Daily Editor : Li Yan ECNS App Download

    Workers inspect a generator rotor at an underground plant at Baihetan Hydropower Station, which became fully operational on Tuesday after a 72-hour trial run of its No 9 generating unit. (Photo/Xinhua)

    Baihetan Hydropower Station, the world's second-largest hydroelectricity project in terms of total installed capacity, went fully operational on Tuesday, significantly contributing to China's carbon-neutrality goals.

    The development marks the completion of the world's largest clean energy corridor, where six mega hydropower stations on the Yangtze River work to transmit power to the country's major energy consumption regions in the east.

    The hydropower station became fully operational after its No 9 generating unit completed a 72-hour trial run on Tuesday morning, according to China Three Gorges Corporation, or CTGC, which built the plant.

    "Baihetan signifies a major breakthrough in China's high-end equipment manufacturing. It is equipped with 16 homegrown hydropower generating units, each having a capacity of 1 million kilowatts, the largest capacity for a single such unit in the world," said Lei Mingshan, CTGC's chairman.

    Built with an investment of 220 billion yuan ($31.59 billion), Baihetan is located on the Jinsha River, in the upper section of the Yangtze River in southwest China, and straddles Yunnan and Sichuan provinces. It is only second to the Three Gorges Dam in Central China's Hubei province in terms of total installed capacity.

    The hydropower station marks a big step in the country's utilization of clean energy to help realize its ambitious climate targets of peaking carbon dioxide emissions before 2030 and achieving carbon neutrality before 2060.

    In full operation, Baihetan will be able to annually generate 62.4 billion kilowatt-hours of electricity, enough to meet power consumption needs of about 75 million people, according to the company.

    Aside from Baihetan, five more hydropower stations on the trunk of the Yangtze — the Three Gorges, the Wudongde, the Xiluodu, the Xiangjiaba and the Gezhouba — are run by the CTGC.

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    LINE
    Back to top About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2022 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    [網上傳播視聽節目許可證(0106168)] [京ICP證040655號]
    [京公網安備 11010202009201號] [京ICP備05004340號-1]
    主站蜘蛛池模板: 团风县| 利津县| 鹿泉市| 比如县| 依安县| 沙湾县| 福泉市| 周口市| 林口县| 贵溪市| 招远市| 鲁山县| 宣威市| 井陉县| 黄龙县| 马尔康县| 泊头市| 南溪县| 柞水县| 澄江县| 正宁县| 深泽县| 武川县| 伊春市| 冀州市| 遵化市| 都安| 渝中区| 文昌市| 怀宁县| 武汉市| 邹城市| 金坛市| 九寨沟县| 德州市| 海伦市| 郑州市| 黄大仙区| 阜平县| 西峡县| 于田县|