LINE

    Text:AAAPrint
    Society

    World's longest cross-sea bridge one step closer to completion

    1
    2016-09-28 09:25chinadaily.com.cn Editor: Feng Shuang ECNS App Download
    A bird's eye view of the Hong Kong-Zhuhai-Macao Bridge on Sept 26, 2016. (Photo/chinanews.com)

    A bird's eye view of the Hong Kong-Zhuhai-Macao Bridge on Sept 26, 2016. (Photo/chinanews.com)

    World's longest cross-sea bridge moved one step closer to completion as the construction of the main structure was completed on Tuesday, reported China Central Television on Tuesday.

    With the final expansion joint laid down, the 55-km Hong Kong-Zhuhai-Macao Bridge marked a milestone on Tuesday morning.

    Hailed by The Guardian newspaper as "one of the seven modern wonders in the world", it is the world's longest bridge under construction. The bridge is comprised of the offshore bridge and tunnel, boundary crossing facilities in Hong Kong, Zhuhai and Macao, and routes connecting the three cities.

    The main structure of the bridge is made up of the 6.7-km underwater tunnel and a bridge spanning 22.9 km. Artificial islands are built at both ends of the tunnel to allow the passage of large ships.

    Next, a full-scale effort can begin on the bridge deck pavement and the final-stage construction of the artificial islands and the tunnel, said the Hong Kong-Zhuhai-Macao Bridge Authority.

    A graphic shows how the Hong Kong-Zhuhai-Macao Bridge connects the three cities. (Photo/chinadaily.com.cn)
    A graphic shows how the Hong Kong-Zhuhai-Macao Bridge connects the three cities. (Photo/chinadaily.com.cn)

    The construction of the bridge is a mega project. According to the authority, the amount of iron used in the main structure alone weighs around 400,000 metric tons, enough for about 60 Eiffel Towers. The deck pavement covers an area as large as that of 98 football fields.

    The tunnel, more than 40 meters under the sea, is made of 33 sections of tube, each weighing 80,000 tons – or the weight of a large aircraft carrier. Eighty percent of the tunnel has been finished, said the authority.

    In addition, 79 expansion joints are laid on the bridge deck to adapt to the changes in temperature and the shift caused by vehicles.

    The bridge is also built to the highest quality standards – it can be used for 120 years, resist level-16 typhoon and earthquake of magnitude 8.0, and the strike of a ship with capacity of 300,000 tons.

    The bridge, planned in 1983, is expected to be completed by the end of next year at the earliest. Once it is completed, the commuting times between Hong Kong and Zhuhai or Macao will be reduced from 3 1/2 hours to only 30 minutes.

     

      

    Related news

    MorePhoto

    Most popular in 24h

    MoreTop news

    MoreVideo

    News
    Politics
    Business
    Society
    Culture
    Military
    Sci-tech
    Entertainment
    Sports
    Odd
    Features
    Biz
    Economy
    Travel
    Travel News
    Travel Types
    Events
    Food
    Hotel
    Bar & Club
    Architecture
    Gallery
    Photo
    CNS Photo
    Video
    Video
    Learning Chinese
    Learn About China
    Social Chinese
    Business Chinese
    Buzz Words
    Bilingual
    Resources
    ECNS Wire
    Special Coverage
    Infographics
    Voices
    LINE
    Back to top Links | About Us | Jobs | Contact Us | Privacy Policy
    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.
    主站蜘蛛池模板: 若羌县| 交城县| 巍山| 栾川县| 益阳市| 金华市| 临湘市| 报价| 连云港市| 通城县| 嘉义市| 广宗县| 汤原县| 武夷山市| 措勤县| 中阳县| 宣化县| 新宾| 汤原县| 商都县| 迁西县| 司法| 刚察县| 吉木萨尔县| 天气| 民丰县| 思南县| 塔河县| 景洪市| 郓城县| 外汇| 莆田市| 武山县| 祁阳县| 平乡县| 寿宁县| 梧州市| 白河县| 肃南| 沁水县| 繁昌县|