Text: | Print|

    Summer Palace renovation

    2014-08-26 09:51 Global Times Web Editor: Li Yan
    1

    Deputy Head of the Summer Palace Zou Ying has stated that all the modern installation of the Palace wall will be demolished during the latest renovation project, reported the Beijing Times.

    So far the first phase of the Palace wall's renovation has been completed, with the second phase estimated to continue until March, 2015. The wall is about 7.9 kilometers long, and although it has received repairs since 1949, this current renovation project is not only about repairing cracks but also removing cement and other modern materials.

    Comments (0)
    Most popular in 24h
      Archived Content
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 香港| 沈阳市| 合肥市| 襄垣县| 白山市| 麻阳| 金华市| 奎屯市| 玉田县| 玉环县| 安福县| 阿图什市| 漳浦县| 石门县| 咸阳市| 安达市| 永修县| 五大连池市| 三穗县| 资源县| 临邑县| 博爱县| 天等县| 调兵山市| 漳浦县| 龙胜| 娄底市| 肇源县| 巴彦淖尔市| 罗山县| 青铜峡市| 冕宁县| 五峰| 枣阳市| 武鸣县| 同仁县| 海门市| 许昌市| 汶上县| 舞阳县| 宜宾县|