Text: | Print|

    Rail bypass protected Ming tomb

    2013-11-19 09:48 Global Times Web Editor: Li Yan
    1

    The Beijing-Shanghai high speed railway project spent more than 23 million yuan ($3.77 million) on extensions as part of a bypass plan to protect an imperial tomb from the Ming Dynasty (1368-1644) in Bengbu, Anhui province, said a chief engineer involved in the project, the Changjiang Daily reported.

    Wang Yuze, a chief engineer of China Railway Siyuan Survey and Design Group, who is responsible for the design of the section from Xuzhou, Jiangsu province, to Shanghai, released the information at a seminar held at the Huazhong University of Science and Technology, Wuhan, Hubei province.

    The imperial tomb is located seven kilometers away from suburban areas of Fengyang, Anhui province. It is where the remains of the parents of Zhu Yuanzhang, the first emperor of Ming Dynasty, rest. Wang said that in order to protect the tomb, the bypass modified the route of the world's longest high speed railway - completed in 2011 at 1,318 kilometers - with the modifications increasing a bridge section by 5,931 meters, and a tunnel section by 285 meters.

    Comments (0)
    Most popular in 24h
      Archived Content
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 鹰潭市| 澳门| 和平县| 蓝山县| 邻水| 望奎县| 合阳县| 收藏| 临邑县| 额敏县| 长子县| 京山县| 焦作市| 巫溪县| 大冶市| 兴业县| 襄城县| 滕州市| 嘉鱼县| 南靖县| 岢岚县| 台东市| 尖扎县| 衡阳市| 依兰县| 满城县| 清水县| 重庆市| 那坡县| 苏尼特左旗| 竹溪县| 睢宁县| 黔西县| 宁河县| 德兴市| 西吉县| 泽州县| 当阳市| 瓮安县| 成安县| 烟台市|