Text: | Print|

    Subway lines coming

    2013-10-31 08:58 Global Times Web Editor: Li Yan
    1

    Six new subway lines and extensions will break ground soon, adding nearly 100 kilometers of track to the Beijing subway. The estimated completion date is 2016, the Beijing Daily reported.

    Construction will begin by the end of 2013 on the Yanfang Line (15 kilometers), the third phase of Line 6 (10 kilometers), the third phase of Line 8 (16 kilometers), the second phase of the Changping Line (11 kilometers), Line 16 (26 kilometers), and the Shanhou Line (16 kilometers).

    The Line 8 extension is expected to present the most challenges. With a route that goes under Wangfujing Pedestrian Street, Chang'an Street, Qianmen and Zhushikou area, its construction work will be constrained by numerous relic protection sites.

    Comments (0)
    Most popular in 24h
      Archived Content
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 辉南县| 蕉岭县| 嘉义县| 孝感市| 黎川县| 汤阴县| 双柏县| 高雄市| 台湾省| 尖扎县| 波密县| 新绛县| 多伦县| 石楼县| 获嘉县| 文成县| 鄂托克旗| 通道| 乐业县| 池州市| 榆社县| 兴业县| 鄢陵县| 航空| 墨玉县| 保康县| 宁河县| 商水县| 西吉县| 义乌市| 凤山县| 乐都县| 石楼县| 邵阳县| 弥渡县| 梁河县| 富宁县| 石嘴山市| 彩票| 达尔| 平利县|