Text: | Print|

    Beijing subway resumes service after signal failure

    2013-09-16 15:12 Xinhua Web Editor: Mo Hong'e
    1

    Service on Beijing's Line 4 subway has been back to normal after repairs made necessary by a signal failure earlier Monday morning.

    The service gradually resumed from 9:10 a.m. when the subway operator, Beijing MTR corporation Limited, fixed the signal failure, company sources said.

    The line suspended operation at around 7 a.m., delaying journeys for thousands of passengers.

    The line, which runs runs 50 kilometers with 35 stations through Beijing from south to north, is one of the busiest in the capital.

    Comments (0)
    Most popular in 24h
      Archived Content
    Media partners:

    Copyright ©1999-2018 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 额尔古纳市| 乌什县| 陕西省| 嫩江县| 田林县| 五莲县| 红河县| 报价| 合山市| 苏尼特左旗| 吉木乃县| 三明市| 聊城市| 平潭县| 麻江县| 南岸区| 南阳市| 新野县| 太保市| 三江| 六枝特区| 梁平县| 霍山县| 门头沟区| 且末县| 钟山县| 金山区| 波密县| 湖州市| 马关县| 仙游县| 保山市| 翼城县| 阳东县| 宣化县| 岑溪市| 龙陵县| 永宁县| 徐州市| 青州市| 沙坪坝区|