Friday May 25, 2018
    Home > News > Society
    Text:| Print|

    New subway routes open to public

    2012-12-31 08:50 China Daily     Web Editor: Wang YuXia comment
    A passenger takes photos at Ping'anli Station in Beijing on Sunday. Four new subway routes went into operation, increasing the length of the capital city's subway to 442 kilometers. [Photo/Xinhua]

    A passenger takes photos at Ping'anli Station in Beijing on Sunday. Four new subway routes went into operation, increasing the length of the capital city's subway to 442 kilometers. [Photo/Xinhua]

    Beijing opened a new subway line and extensions of three others on Sunday, marking a step forward in the capital's efforts to expand its rail transit system to ease severe traffic congestion.

    The new line and sections — Line 6 and extensions of lines 8, 9 and 10 — began operating early on Sunday and 698 trains had traveled on them by noon that day, Beijing Subway Company, which operates the lines, said on its website.

    The Beijing subway now has 442 kilometers of lines, making it the longest in China.

    The first train began to run on Line 6 at 5:15 am on Sunday, starting its journey from Caofang Station in the eastern part of the city.

    One white-collar worker surnamed Huang said he was pleased with the new service after taking a Line 6 train from the Qingnianlu Station, toward the eastern part of the line, to the Hujialou Station, where he transferred to Line 10.

    "It took only about 8 minutes to go three stations, which was really fast," Huang said.

    Huang said the trains on Line 6 are more comfortable and longer than those on the older lines.

    The new eight-carriage trains that travel on the line can carry nearly 2,000 passengers at a time, the Beijing Youth Daily reported.

    A subway worker surnamed Li who works at Cishousi Station, a station on both lines 6 and 10, said she and her colleagues had prepared for two months for the official opening on Sunday. Every station has six to seven workers who take tickets, maintain security and direct traffic.

    Technicians were under huge pressure to conduct signal experiments before the extended section of Line 10 began operating.

    The signal experiments were not allowed to interrupt the operation of older sections of the line, a requirement that made the preparation work very difficult, said Zhang Yanbing, a senior engineer at the equipment department of Beijing MTR Construction Administration Corp, which built the new line and extensions. Most of the tests were conducted at night, Zhang said.

    With the completion of two other stations in mid-2013, Line 10 will become Beijing's second subway loop line and the longest line in the city.

    Li Dongsheng, a retiree who lives in the city's Tongzhou district, said he made a special trip on Sunday on Line 6 from Caoqiao Station to Nanluoguxiang Station, a journey that took him 30 minutes.

    Comments (0)

    Copyright ©1999-2011 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 灵璧县| 清涧县| 隆林| 江永县| 宁海县| 库尔勒市| 青神县| 桓仁| 金华市| 池州市| 山东省| 个旧市| 渭源县| 紫阳县| 尼勒克县| 秦安县| 湟源县| 象州县| 沂水县| 蛟河市| 西丰县| 平罗县| 蒲城县| 莱西市| 兴隆县| 蒙山县| 临西县| 尼玛县| 九江市| 石泉县| 扎赉特旗| 都江堰市| 灵石县| 临武县| 谢通门县| 屯留县| 桦川县| 江阴市| 东阿县| 马关县| 富民县|