Friday May 25, 2018
    Home > News > Science
    Text:| Print|

    China's second icebreaker enters detail design phase

    2012-10-23 09:13 Xinhua     Web Editor: Mo Hong'e comment

     The detail design of China's second icebreaker will be conducted by a domestic shipbuilding company, according to the Polar Research Institute of China.

    The institute signed a cooperative agreement regarding the detail design with the China State Shipbuilding Corporation (CSSC) on Monday.

    "This marks a giant step toward the goal of building a completely domestic icebreaker," said Chen Lianzeng, deputy director of the State Oceanic Administration (SOA).

    The vessel was planned by the State Council to be designed by Chinese and foreign experts but entirely built by China, according to the SOA.

    The basic design of the icebreaker, China's second after the Ukraine-imported Xuelong, was done by the Finland-based Aker Arctic Technology Inc..

    Due to go into operation in 2014, the new icebreaker will join the Xuelong for polar expeditions.

    Comments (0)

    Copyright ©1999-2011 Chinanews.com. All rights reserved.
    Reproduction in whole or in part without permission is prohibited.

    主站蜘蛛池模板: 泽普县| 兴文县| 湾仔区| 益阳市| 天峻县| 基隆市| 巧家县| 府谷县| 津南区| 涞水县| 资溪县| 宁德市| 冷水江市| 思南县| 承德县| 新巴尔虎左旗| 晋州市| 延长县| 揭西县| 双桥区| 安福县| 偏关县| 鲜城| 化隆| 琼中| 建瓯市| 浮山县| 桂阳县| 福鼎市| 迭部县| 临沭县| 怀柔区| 文成县| 华宁县| 博野县| 芦山县| 砚山县| 牡丹江市| 株洲市| 板桥市| 逊克县|